TNA Automation
Time & Action dates calculated against three national holiday calendars and lead times
90% time saved
T+A AUTOMATION
01 / ANCHOR
- Mode
- Target Delivery (back-solved)
- Date
- 2026-11-20
- Style No
- STYLE-0000
02 / LEAD TIME
- FABRIC
- Fabric PO → In-house45 days
- TRIM / PRODUCTION
- Trim In → Sewing Start12 days
- WASH / GRAPHIC
- Washing7 days
GENERATE T+A SCHEDULE
SCHEDULE
- Fabric PO2026-08-24
- Fabric In-house2026-10-12
- Sewing Start2026-10-28
- Ex-factory2026-11-20
REFLECTED HOLIDAYS
KR 3 / VN 2 / CN 1
PROBLEM
Every time & action plan was worked back from the ex-factory date by hand. When the buyer pulled a shipping date in, the whole schedule behind it had to be recalculated.
THE OLD PROCESS
- 01Confirm the ex-factory date
- 02Work back to fabric and trim in-house dates
- 03Derive cutting and sewing start dates
- 04Type it into a spreadsheet
- 05Build a chart to share
- 06Start over whenever a date moves
WHAT I BUILT
- Milestones are calculated back from the ex-factory date and charted in one pass
- Lead times are held in the tool rather than re-entered per order
- National holidays for every country involved are built into the calculation
- Move the shipping date and everything recalculates